Archive for ‘Díaz y Díaz Arquitectos’

February 1, 2011

Edificio de Control CCS del Puerto Exterior de Ferrol | Díaz y Díaz Arquitectos

edificio puerto de ferrol 01

edificio puerto de ferrol 02

edificio puerto de ferrol 03

_mg_9442

_mg_9461

_mg_9488

CCS Control Building of the Outer Harbour of Ferrol

The building is like the prow of a ship ready to weigh anchor and set sail on the main dam hammer Ferrol port open to the views of the estuary. Objectives: uniqueness and presence, functionality and flexibility, building “intelligent” and “high-tech” economy and easy maintenance.

Project
Multipurpose building of the Port Authority and Control of the Outer Harbour of Ferrol in collaboration with Antonio Desmonts Sierra
Promoter
Port Authority of Ferrol-San Ciprian
Rigger
Fernando Bores
Jose Salas
Construction: Dragados
Date: 2010
Surface: 2130 m²

http://www.diazydiazarquitectos.com/proyectos/detalle/Publico/Edificio%20de%20Control%20CCS%20del%20Puerto%20Exterior%20de%20Fer/

 

February 1, 2011

Nautical Portonovo | Díaz y Díaz Arquitectos

Nautical Portonovo / Díaz y Díaz Arquitectos © Mark Ritchie

Nautical Portonovo / Díaz y Díaz Arquitectos © Mark Ritchie

Nautical Portonovo / Díaz y Díaz Arquitectos © Mark Ritchie

Nautical Portonovo / Díaz y Díaz Arquitectos © Mark Ritchie

Nautical Portonovo / Díaz y Díaz Arquitectos © Mark Ritchie

lower floor plan lower floor plan

ground floor plan ground floor plan

situation plan situation plan

west elevation west elevation

north elevation north elevation

section section

Architects: Díaz y Díaz Arquitectos
Location: 
Project area: 465 sqm
Project year: 2010
Photographs: Mark Ritchie

The site for the Nautical Sports Services Building of  is located at the end of the marina breakwater. (Sanxenxo, Pontevedra) The project aims at expanding and improving facilities for the Nautical Sports Services of the port. This will take the demolition of part of the existing building and relocation of the different uses inside. The idea cosists in wrapping the original building with a new facade of black-colored phenolic panels, giving a modern view of the Club and guaranteeing waterproofing and insulation in this exposed area.

An additional building is attached along its southern front with an independent structure, offering new spaces for the users. The height above grade, will be matched to the height of the current roof. The resulting volumetry are developed in the east-west longitudinal axis allowing two large facades that open onto the beach  (north) and to the port (south).

The rythnm marked on the new volume reflect the idea of the cargo containers. It creates a new granite promenade of different formats and large IP decks.

http://www.archdaily.com/106870/nautical-portonovo-diaz-y-diaz-arquitectos/