Edificio de Control CCS del Puerto Exterior de Ferrol | Díaz y Díaz Arquitectos

edificio puerto de ferrol 01

edificio puerto de ferrol 02

edificio puerto de ferrol 03

_mg_9442

_mg_9461

_mg_9488

CCS Control Building of the Outer Harbour of Ferrol

The building is like the prow of a ship ready to weigh anchor and set sail on the main dam hammer Ferrol port open to the views of the estuary. Objectives: uniqueness and presence, functionality and flexibility, building “intelligent” and “high-tech” economy and easy maintenance.

Project
Multipurpose building of the Port Authority and Control of the Outer Harbour of Ferrol in collaboration with Antonio Desmonts Sierra
Promoter
Port Authority of Ferrol-San Ciprian
Rigger
Fernando Bores
Jose Salas
Construction: Dragados
Date: 2010
Surface: 2130 m²

http://www.diazydiazarquitectos.com/proyectos/detalle/Publico/Edificio%20de%20Control%20CCS%20del%20Puerto%20Exterior%20de%20Fer/

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: